2-2-4 Load Restrictions. 2-2-5 Space Requirements. 2-2-6 Safety Requirements. Note: solvent gas specific gravity is greater than air, it would accumulate near the floor.




2-2-4 Load Restrictions

 

Equipment net weight 200-250 kg.

Device maximum expected general increase of 60 kg.

Recommend that the equipment should be installed at 4 pieces 20 cm in diameter on the plate, or more than 4 pieces 200 x 200 mm, 8 mm thickness of the steel plate.

 

2-2-5 Space Requirements

 

The front of device refers to printing input side. Equipment requirements front reserved 1 m. Keep 0. 5 m on the back, left and right edges keep 0. 5 m each. In addition, the space reserved area also includes 2. 5 m height above the ground. Besides, the machine also should make room for feeding or unloading the supplies.

 

2-2-6 Safety Requirements

 

u Fire Prevention

Inks and solvents must be enclosed in a special storage cabinet for nonflammable liquids, or within a separate storage room, and must be clearly identified to meet the professional requirements of safety regulations.

Ink storage must be strictly compliance with local fire regulations about the use and storage of combustibles.

Carbon dioxide and dry chemical fire extinguishers should be placed in all channels of the obvious and easy access location. They should be on the device and nonflammable liquid storage cabinet (room) nearby, or to comply with local fire regulations require.

 

u Ventilation

In order to prevent the danger caused by volatile gas accumulation, must have sufficient ventilation to ensure every 1 hour replacing the air of the working area of about 6 to 8 times, vents should be low enough so that gas cannot accumulate on the floor near the volatile.

When the media gets through of drying devices, because ink solvents are volatile, so need an emission system

Note: solvent gas specific gravity is greater than air, it would accumulate near the floor.

Installation work in the vicinity of electrical equipment must conform to GB/T standards, national electrical regulations requirements for level II sites, and installation. by a corresponding qualification of professional electrical contractor.

 

 


2-2-7 Electrical Requirements

 

Devices use single phase power and require ensuring a good grounding connection independently. Grounding resistance less than 10 ¦ё

Power supply range: 220V voltage (ЎА 10%), AC 50Hz or 60Hz. Users must assign a professional electrician or contractors to install power supply.

Circuit breaker ratings are as follows:

 

Power Supply\ Voltage AC 220V AC 110V
Single phase 10A/phase 20A/phase

 

Maximum power consumption is less than the 2-kilowatt, average power consumption of 1. 2 kW.

UPS available 3KW, can be simultaneously connected to the computer and the power of the machine.

Device accompanied with a standard 5-metre cable.

 

2-2-8 Operator Requirements

 

For the operator of the machine, it is recommended as followsЈє

Responsible for the operation and maintenance of the machine;

Keep in touch with the XunLang after sale services;

Can solve the problems by telephone;

Experiences of PC and Windows;

Technical Background of machine or electricity;

Capacity and theory about color, the knowledge of pre-printing and after-printing;

 

2-2-9 Installation Requirements

 

Installation requirements devices must be installed in a standard place. After the device in place, use gradienter to check from the front to the back and make sure the ground is plain enough. It is suggested that to install a telephone beside the operator console to facilitate the daily operation.

 

 

 


2-3 Checking Before the Installation

 

Ё№ Should report to the dealer the site's voltage in advance.

Ё№ The machineЎдs power Jack is at the back of the machine ( on the left).

Ё№ Air conditioning of the room should be sufficient, and keep above temperature (15-35 Ўг c).

Ё№ Customers should prepare in advance an appropriate machine installation tools: above 1-ton forklift truck or 1 ton crane. Must in advance inform Xunlang all the tools used by the company or the resulting delay will be charged.

Ё№ The customer should not open the box if the engineer is not presence.

Ё№ Any damage of packaging should, before the engineer arrives, take pictures and immediately report to the dealer.

Ё№ Customers must complete all preparations and cleaning before the engineer arrives because dirt may cause some damage to the machine.

Ё№ Customers should prepare other devices, such as MAC and Photoshop Freehand, Illustrator, other application software and 100M computer networks used by MAC.

Ё№ During the installation, should have at least two operators next to the machine, who have proficient computer skills, printing experience is preferred.

Ё№ Before the operator gain enough experience, customers do not produce alone. Training program must be taken in advance.

Ё№ Ink from ordering to delivery need long time, the customer should order in advance to avoid affecting the normal production.

Ё№ The customer had better order some normal spare parts to void affecting the production.

Ё№ On the shipping container labeled " right and left" and " before and after", please note when loading and unloading.

Ё№ Please carefully read the engineers machine check file, each item in the table are required " YES", after everything is ready, pass it back to the Distributor customer service and maintenance center before you start the installation.

 

2-4 Shipment, Opening Box and Checking